Vella Civil kicked off the Austral Project removing 3000 tonne of general solid waste and bringing in 2000 cubic metres of compactable material. 280 foundation piles were inserted with the use of the Vella Civil Piling Rig with footing and pads positioned in preparation for a concrete slab. Vella Civil has set the foundation for a new stage build at Al-Faisal College in preparation for a new school building.

Vella Civil kicked off the Austral Project removing 3000 tonne of general solid waste and bringing in 2000 cubic metres of compactable material. 280 foundation piles were inserted with the use of the Vella Civil Piling Rig with footing and pads positioned in preparation for a concrete slab. Vella Civil has set the foundation for a new stage build at Al-Faisal College in preparation for a new school building.